| INSTALLATION DETAILS |
| I) IN AIR ( installed on non-continuous brackets, ladder supports or cleats) |
| a) Single Core |
| 1) Two Cables spaced 'De' vertical |
 |
| 2) Three cables trefoil |
 |
| 3) Three Cables (flat) spaced 'De' vertical |
 |
| b) Multi Core |
| 1) Single cable touching wall |
 |
| II) IN GROUND |
| a) Single Core |
|
| 1) Two Cables spaced 'De' vertical |
 |
| 2) Three cables trefoil |
 |
| 3) Three Cables (flat) spaced 'De' horizontal |
 |
| b) Multi Core |
|
| 1) Single isolated buried Cable |
 |
| III) IN DUCT ( Multi Core Cables) |
| 1) Single isolated buried ducts |
 |
NOTE:- De : External diameter of cable D : Depth of Laying. |